A turnkey quote asks a single partner to fabricate the board, source the components, assemble, test, and ship a finished product—which means the RFQ needs to answer fabrication questions, sourcing questions, and assembly questions all in one package. Missing any one category does not just slow the quote down; it usually means the first number you get back is an estimate with built-in margin for the unknowns, not a firm price.

This checklist pulls together the fabrication, BOM/centroid, and sourcing information a complete turnkey RFQ needs, with pointers to the detailed guides behind each section.

Fabrication data

The bare-board package: Gerbers or ODB++, drill data, a clear layer map, stackup notes, impedance tables if applicable, surface finish callout, and mechanical drawings. This is the same data a fabrication-only quote needs—see the full Gerber and fabrication-data checklist for the complete list.

BOM, centroid, and assembly drawing

The component and placement data: a BOM with manufacturer part numbers and documented alternates, a centroid/pick-and-place file with a stated rotation and origin convention, and an assembly drawing marking polarity and special instructions. See the Gerber, BOM, and pick-and-place file checklist for the detail behind each document.

Sourcing notes: what turnkey adds beyond consigned assembly

Because the assembler is procuring components in a turnkey program, the RFQ should state lead-time flexibility (can the program wait on a long-lead part, or does it need an alternate approved in advance), any components already on hand or pre-purchased, and any vendors or part numbers that are specifically excluded for compliance or qualification reasons. Without this, a turnkey quote has to assume worst-case lead time and no flexibility, which inflates both price and schedule.

If some components are consigned (customer-supplied) while others are sourced by the assembler—a common hybrid model—state which reference designators fall into each category explicitly. A partial list with an implied “source the rest” assumption is a frequent source of quote revision after the fact.

Quantities, test, and documentation requirements

State target quantities at more than one break—prototype quantity and a projected production volume—so the quote can reflect setup-cost amortization realistically rather than pricing a single quantity point that does not represent how the program will actually scale. Include test and inspection requirements (AOI is typical by default; state explicitly if X-ray, functional test, or ICT apply) and any documentation deliverables (certificates of conformance, test reports, serialization) your program needs.

Pair this checklist with the PCB assembly cost guide to understand how each of these inputs moves the final number, so the quote you get back can be evaluated against the drivers that produced it rather than treated as an opaque total.

Frequently asked questions

What is the biggest difference between a turnkey RFQ and a fabrication-only RFQ?
Sourcing information—lead-time flexibility, alternate-part approval, and which components (if any) are customer-consigned versus assembler-sourced. Fabrication-only RFQs do not need any of that.
Should I request pricing at a single quantity or multiple quantity breaks?
Multiple breaks, including your prototype quantity and a realistic production projection. Setup cost amortizes differently at each volume, so a single quantity point does not show how the program will actually scale in cost.
What if some parts are long-lead or currently unavailable?
State that explicitly along with any approved alternates. A turnkey quote without this information has to assume worst-case lead time, which inflates both the quoted price and schedule.
Can a turnkey program mix customer-consigned and assembler-sourced parts?
Yes, and it is common. List which reference designators fall into each category explicitly rather than leaving the split implied—see turnkey vs. consignment PCB assembly for how hybrid models are typically structured.
Does a turnkey RFQ need the same fabrication detail as a fabrication-only quote?
Yes—fabrication data does not get lighter just because assembly and sourcing are bundled in. Include the same stackup, impedance, and finish detail either way.